News
Home » News

Goole Valve News

  • ① The pressure reducing valve is generally assembled after shell pressure testing, and it can also be tested after assembly. Shell test duration: 1min for DN<50mm; more than 2min for DN65~150mm;...

    2020.10.06

    Read More
  • 2020.05.05

    Read More
  • Ball valve Advantages and Disadvantages It evolved from a plug valve. Its opening and closing part is a ball. The ball is rotated 90 ° around the axis of the valve stem to achieve the purpose of op...

    2021.01.23

    Read More
  • ① The strength test of the safety valve is the same as other valves. It is tested with water. When testing the lower part of the valve body, the pressure is introduced from the inlet and the sealin...

    2020.10.05

    Read More
  • 2020.05.05

    Read More
  • Total 29 pages  Go to Page
  • Go
It is an intelligent manufacturing enterprise that integrates production, sales, and services, with mature technical strength, advanced production equipment, strong production capacity, and excellent service team.

Quick Links

Product Category

Contact Us

Contact Person: Cathy
E-mail: cathy@goolevalve.com
Landline: +86-577-5778-1015 
Address: No. 460 Zhangbao East Road, Oubei Town, Yongjia County, Wenzhou City, Zhejiang Province, P.R.China
Copyright © 2025 Goole Valve technology Co., Ltd. All Rights Reserved.  SitemapPrivacy Policy.